• Home
  • Science
  • Technology
  • Futurism
  • Weather Extreme

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Daring Fireball: Wavelength

March 28, 2023

What is a country’s current account balance, and is a deficit good or bad for its economy? – The European Sting – Critical News & Insights on European Politics, Economy, Foreign Affairs, Business & Technology

March 28, 2023

Miami Dade College Partners with eMerge Americas 2023 to Offer a Stellar lineup During Miami Tech Month

March 28, 2023
Facebook Twitter Instagram
Facebook Twitter Instagram YouTube
Futurist JournalFuturist Journal
Demo
  • Home
  • Science
  • Technology
  • Futurism
  • Weather Extreme
Futurist JournalFuturist Journal
Home » Countdown Progressing for NASA’s Artemis I Wet Dress Rehearsal
Latest Science

Countdown Progressing for NASA’s Artemis I Wet Dress Rehearsal

NewsBy NewsApril 3, 2022Updated:April 3, 2022No Comments3 Mins Read0 Views
Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Complex 39B, Saturday, April 2, 2022, as the Artemis I launch team conducts the wet dress rehearsal test at NASA’s Kennedy Space Center in Florida. Ahead of NASA’s Artemis I flight test, the wet dress rehearsal will run the Artemis I launch team through operations to load propellant, conduct a full launch countdown, demonstrate the ability to recycle the countdown clock, and drain the tanks to practice timelines and procedures for launch. Credit: NASA/Joel Kowsky

At approximately 5 p.m. EDT yesterday (April 1), or L-45 hours, 40 minutes before the initial targeted test T-0, the launch team arrived at their stations inside the Launch Control Center at NASA’s Kennedy Space Center in Florida. The countdown began for the wet dress rehearsal test for NASA’s Artemis I mission.

Artemis I Moon Rocket Rollout

The rocket that will launch NASA’s Orion spacecraft to the Moon with the European Service Module on its way to the launchpad in Florida, USA, for its first full test before the Artemis I launch later this year. Credit: ESA–A. Conigli

Prior to “call to stations” the team completed several activities including closing the Orion crew module hatch and conducting leak checks. Technicians then closed the hatch on the launch abort system and conducted final activities in the White Room, the access point between Orion and the Mobile Launcher. The crew access arm, where the White Room is located, was retracted away from the spacecraft and rocket. On March 31, Orion was powered-up and will remain on throughout the duration of the test.

Teams filled sound suppression system with water at the launch pad, which is used to dampen and absorb acoustic energy during liftoff. Even though the Space Launch System engines will not fire during this test, teams are practicing carrying out operations as they would on launch day.

Overnight, teams charged the SLS core stage batteries and configuref ground systems to power up the stage, and purge and remove ducts for the RS-25 engines.

Around 3 a.m. on Saturday, April 2, at approximately L-35 hours and 20 minutes, the Artemis I launch control team powered up the Space Launch System rocket’s core stage, which will be loaded with more than 700,000 gallons of propellants during the tanking phase of the countdown. During the day, teams will charge Orion flight batteries, conduct final preparations on umbilical arms, and conduct a final pre-launch walkdown.

While operations at the pad may not be visible during today’s activities at the launch pad, NASA is streaming live video of the rocket and spacecraft on the Kennedy Newsroom YouTube channel.

NASA is also sharing updates on the Exploration Ground Systems Twitter account. Real-time updates from Jeremy Parsons, deputy manager of the Exploration Ground Systems Program, will begin on the account when the launch director and mission management team chair give a “go” for tanking operations, expected to occur around 7 a.m. EDT on Sunday, April 3.

Source

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
News
  • Website

Related Posts

Texas scientists name newly discovered ancient beaver after Buc-ee’s, the state’s wildly popular rest stop

March 28, 2023

Low Key Hole Opens Up in Sun

March 28, 2023

Scientists discover colossal black hole pointed toward Earth

March 27, 2023

Webb measures the temperature of a rocky exoplanet

March 27, 2023

Webb Telescope confirms nearby rocky planet has no significant atmosphere

March 27, 2023

Planets on parade: 5 will be lined up in night sky this week

March 27, 2023

Leave A Reply Cancel Reply

You must be logged in to post a comment.

Recent Posts
  • Daring Fireball: Wavelength
  • What is a country’s current account balance, and is a deficit good or bad for its economy? – The European Sting – Critical News & Insights on European Politics, Economy, Foreign Affairs, Business & Technology
  • Miami Dade College Partners with eMerge Americas 2023 to Offer a Stellar lineup During Miami Tech Month
  • Marfusha for PS5, PS4, Xbox One, and Switch launches April 6
  • IBM Unveils Quantum Computing Research Center in Spain
Recent Comments
    Demo
    Top Posts

    How Emerging Technology is Helping Teams Save on Development Costs

    March 22, 20232 Views

    The Indian Startup Pulling Water From The Air

    February 3, 20232 Views

    iPhone 14 eSIM: What you need to know

    September 10, 20222 Views
    Don't Miss

    Daring Fireball: Wavelength

    March 28, 2023

    Monday, 27 March 2023 In September 2020, a new social network named Telepath launched. I…

    What is a country’s current account balance, and is a deficit good or bad for its economy? – The European Sting – Critical News & Insights on European Politics, Economy, Foreign Affairs, Business & Technology

    March 28, 2023

    Miami Dade College Partners with eMerge Americas 2023 to Offer a Stellar lineup During Miami Tech Month

    March 28, 2023

    Marfusha for PS5, PS4, Xbox One, and Switch launches April 6

    March 28, 2023
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Demo
    Most Popular

    How Emerging Technology is Helping Teams Save on Development Costs

    March 22, 20232 Views

    The Indian Startup Pulling Water From The Air

    February 3, 20232 Views

    iPhone 14 eSIM: What you need to know

    September 10, 20222 Views
    Our Picks

    Daring Fireball: Wavelength

    March 28, 2023

    What is a country’s current account balance, and is a deficit good or bad for its economy? – The European Sting – Critical News & Insights on European Politics, Economy, Foreign Affairs, Business & Technology

    March 28, 2023

    Miami Dade College Partners with eMerge Americas 2023 to Offer a Stellar lineup During Miami Tech Month

    March 28, 2023
    Editor's Pick

    Op-Ed: Iranian women are rising up to demand freedom. Are we listening?

    September 24, 2022

    Dozen homes burn, five people hospitalised in Greece wildfire | Greece News

    July 31, 2021

    Astronaut James McDivitt, Apollo 9 commander, dies at 93

    October 18, 2022
    Futurist Journal
    Facebook Twitter Instagram Pinterest YouTube Dribbble
    • Contact Us
    • Privacy Policy
    © 2023 futuristjournal.com - All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.